Aerospace Concurrent Engineering can supply teams
of Engineers to control all aspects or individual aspects of Interiors Design
Packages from the initial Concept Design to detail design and Manufacture inclusive
but not limited to the following:
|
PHASE 1: CONCEPT DESIGN (ITCM/PDR)
Development/Project Control schedule (including manufacturing)
Structure and systems specification freeze
Initial Interface Loads / Decompression Analysis
Target Weights/costs
Preparation of initial Scheme Drawings including initial LOPA
Preparation of Digital Mock-up
|
 |
|
 |
PHASE 2: INITIAL/DETAIL
DESIGN
Space Envelope: Digital Mock-up
Aircraft Installation: Structure and Systems Design
BOM Definition: Cost and Weight Validation
Component Detail Design
Detailed Certification Programme
|
|
 |
PHASE 3:- MANUFACTURE
Programme Management of the Manufacturing Process
Detail Design / BOM Integration into Manufacturing
Manufacture – Key Components
|
 |
|